![]() |
|
Welcome to Elise Adelaide's Website | home
Our Dream House - Page 21
December 11, 2004
It will be easier entering the house from the garage now with the steps in place. Later, these steps will be wood-stained.
![]() The installing of the crown molding is nearly complete now, this being in our nursery.
![]() And this our 12 foot ceiling arched entryway. Mounting the wood-stained trim, i.e. the crown, baseboard, etc. is just one part of the work. It still all needs to be cleaned, sand-sealed, varnished for protection, and then polished.
![]() January 10, 2005
The time-consuming wood-staining process continues - with the main floor doors.
![]() ![]() The snow and rain has delayed the installation of our driveway, but now it is finally done! It will be a few weeks before we're able to drive on it.
![]() The basement kitchenette counter-top is installed. This kitchenette is very small compared to our main floor kitchen, but it will be nice to have a small food preparation area in our basement.
![]() More progress on the fireplaces, the "surround" (the area surrounding the fireplace, in this case marble) is finished. As you can see this is freshly done - the sealant is still wet. The next step will be to install the wooden mantle which will go around the marble.
![]() Similarly, the "surround" on our other fireplace has been installed too, this one is granite.
![]() |
||