August 31, 2004
The last day of August, and the drywall "hanging" portion is about 2/3 done. "Finishing" drywall upstairs also continues - this is the west end of Bonus Room #1 (with the laundry chute at the southwest corner).
![]() Another southwest corner view - but this time it is our upstairs Living Room.
![]() The brickwork is getting close to being done. If you look closely you can see a tiny area below the north garage window where some brick have been cut out. This is because Joseph inspected the brickwork carefully and had the brick masons replace brick that had been cracked. Also note Aileen at the bottom right of the photo - she was actually filming with the camcorder at the same time this picture was taken.
![]() September 1, 2004
Another step in the drywall "finishing" process is sanding the walls.
![]() The top gable is one of the most difficult sections to brick.
![]() Almost done now.
![]() September 3, 2004
With hanging of drywall in the both the upstairs & basement levels complete, it is time to start hanging drywall on the main floor. As an example, this is the southeast corner of our Nursery.
![]() And after only 3 weeks, the brickwork is done!
![]() ![]() |
||