July 28, 2004
This past week the electricians have been very busy working on the inside of the house.  At this point, they are almost half way done with the wiring.  This includes the wiring for all the lighting.


Light switches, receptacles, cable TV outlets, phone lines, surround sound speaker wires, computer modem outlets, etc. - There is a lot of wiring to install.


Including electrical power feeds which will be pulled back to near here - the future location of our main circuit breaker panels.


July 30, 2004
During this time we also made a minor change to one of the rooms on the Main Floor, can you spot the difference?

(Answer:  added a window to the Nursery - below is the "Before" picture:)


Aug 9, 2004
Both the wiring and the plumbing must be completed before the insulation & drywalling can begin.  With the electricians nearly done, it was time to also wrap up the indoor plumbing.  This included installing our newly-arrived marble tubs!



This tub in the upstairs bathroom.


And this shower base for the bathroom in the basement.


Soon, there will be a lot of changes on the outside of our home as well, as the brick was delivered today!

Go To Our Dream House Page 12

Back to Our Dream House Page 10