Our Dream House - Page 10
July 14, 2004
The heaters are now in place - this is the heater for the second level.
Aileen and Elise came by for an evening visit to check progress - I think Elise approves so far!
![]() Yesterday Joseph had the initial walk-through with the electrician. This first walk-through took over 3 hours and he and the electrician completed approximately 2/3 of the house. For those areas - decisions were made regarding locations of every switch, along with what (i.e. lights, ceiling fans, etc.) each switch will control. Also exact locations of things like receptacles, phone jacks, TV jacks, cable modem connection points, etc. were determined. Hopefully they can complete the remainder of the house during the upcoming second walk-through.
![]() The roofing is now complete.
![]() July 15, 2004
Much of the plumbing is done now. As with everything on a custom-built home, this involved a multitude of decisions - like something as simple as determining where the outside water faucets are to be located.
![]() Our master bathroom whirlpool tub has arrived! It is listed as a "True 2-person Tub" and has 14 flow-adjustable and directional jets including a 6-jet and a 3-jet lumbar back massage, and holds over 100 gallons of water.
![]() The rest of the tubs in the house are marble and are due to arrive in a few weeks.
![]() July 21, 2004
Our front door has arrived!
![]() |
||