![]() |
|
Welcome to Elise Adelaide's Website | home
Our Dream House - Page 8
July 2, 2004
Day 3 of the framing and time to wrap things up! One of the last things the framers do is to mount the windows.
![]() And to install the framing for the fireplaces.
![]() The windows are now in, as are our French Doors (the walk-out basement circle-top French Doors are shown in this photo).
![]() Here's a photo of another set of French Doors - these for our back porch.
![]() And a snapshot inside (on the stairs leading up to the landing which goes to the second floor). We still can't hardly believe that the crew could frame a
7000+ square foot home in less than 3 days, but they did!
![]() |
||