Free Web Hosting | free host | Free Web Space | BlueHost Review
Welcome to Elise Adelaide's Website     |     home
                                                  
Our Dream House - Page 8
July 2, 2004
Day 3 of the framing and time to wrap things up!  One of the last things the framers do is to mount the windows.


And to install the framing for the fireplaces.


The windows are now in, as are our French Doors (the walk-out basement circle-top French Doors are shown in this photo).


Here's a photo of another set of French Doors - these for our back porch.


And a snapshot inside (on the stairs leading up to the landing which goes to the second floor).  We still can't hardly believe that the crew could frame a 7000+ square foot home in less than 3 days, but they did!

Go To Our Dream House Page 9

Back to Our Dream House Page 7